Employment/Consulting
History
By:
Al Mingione
08/85
to Present |
DPCS-NC,
San Jose, Technology and Management Consulting Company |
---|
| IRM
Director: Conducted Strategic Planning Assignments, facilitated and
advised system development projects, and principal analyst for advanced
technology business applications. President, Information Technology
Center - Fiber Optic and Computer Application skills training school.
Developed curriculum for PC Literacy, Telecommunications classes, and
INTERNET.
|
3/71
to 08/85
| Self
Employed -Information System Consultant - Partial List
|
| Managed
an Installation Project Team with $.5 Million consulting budget
and 5 to 10 internal employees. Successfully customized the manufacturing
system software package to increase worker performance with on-line access.
(Inventory Control, Order Management, Standards, Master Scheduling and
MRP) HP3000, Image, Powerhouse, Bar Code, Protos
|
| Planning
Consultant to the Executive Director
of Foundation for Medical Care of Santa Clara County. Formulated System
requirements for the Medical Claims Processing, conducted software and
hardware evaluations, and advised on vendor contracts. (HP 3000, Plexus,
Image).
|
| Project
Consultant to a large (600 people) Maintenance Management Organization.
Formulated the system requirements to estimate, schedule and track work
orders and contractor work in process. Advised on RFP, evaluated and recommended
selection of computer hardware and software. Performed data base and program
design (HP 1000, Pascal, Image, HP factory input transactors)
|
| Senior
Analyst to the Administrator and
Clerk of the Court for four Municipal Courts in California. Planned system
projects, advised on development standards, and prepared RFP for contract
programming. Formulated requirements for three court applications: Parking
Citation; Criminal Calendar/Case Management; and Moving Traffic Citation.
Conducted data base design and program design on IBM 30XX, IDMS, Data
General. Reported progress and recommendations to presiding Judge and
County Justice Steering Committee.
|
| Quality
Assurance Consultant: Insured software quality of credit card
system applications for two oil companies and one bank. PL1, COBOL, IBM
Mainframes, DMS, CICS, IMS.
|
07/67
to 03/71
| Systems
Director: Western Operations Inc. Computer management consulting
firm. Developed/installed software package for hospital information system.
COBOL, IBM 360.
|
| Senior
Consultant: Structured system
techniques - adoption and adaptation..
|
04/65
to 07/67
| MIS
Project Manager: Dole Company. Developed MIS system for product
planning, marketing, sales and financial reporting.
|
09/63
to 04/65
| Programmer
Analyst: General Dynamics. Developed real time quality control
collection and reporting system. COBOL
|
03/62
to 09/63
| Programmer:
North American Rockwell. Analyzed and programmed applications for
shipping system; member of Minuteman missile computer control deployment
project.
|